If the shingle already has flashing on it the kickout flashing has to slip beneath it and you ll have to loosen or remove siding to do this.
Roof flashing wood siding.
Lay a shingle over the step flashing starting at the roof edge.
Wood siding clearances wood trim and siding should always be installed with an air gap when installed at a roof ground or concrete contact area.
That is fine but it must still look like the flashing is behind the siding.
How to install step flashing under siding 1.
Cut a piece.
Flashing is typically used to make the connection between the two.
Slice along the bend line about 4 inches into the first piece of flashing at the bottom of the roof with tin snips.
Stop wood sidings at least 1 inch short of the bottom leg at step flashings and other roof flashings.
Failing to replace step flashings when a cedar shake roof is replaced with a composition shingle roof.
Fasten that shingle with two galvanized nails at the.
Install the first length of z flashing.
The only way is to cut a groove in the siding and flash the roof wall intersection.
It is at the back of the porch roof where the roof meets the house siding.
Today the flashing is on top of the siding.
Siding details at roof wall joint step flashings to avoid rot.
Traditionally the flashing was installed and hidden under the siding.
Or pull the nails out of the closest layer of siding and slip the flashing up under it and hopefully under the moisture barrier.
Step flashings on a cedar shake roof are typically installed every 10 inches.
Click to enlarge any image otherwise water will wick up into the flashing leading to paint failures and decay see figure 1 6 above left.
Begin at either end of the wall and set the level middle section of the z flashing onto the top edge of the siding panel with the wider flange upward and against the wall framing.
Imo and that is all it is.