Permit residential framing checklist approved city stamped plans roof specifications and engineered floor system information is on site and accessible to inspector.
Roof framing checklist.
Determine if double studs are face nailed with 10d nails at 24 in.
Depending on how wide the home is you can divide the total length in feet by two to determine how many trusses will be needed.
In high wind areas sheathing along the eaves rakes and ridges is nailed every 6 in.
Wall framing inspection checklist continued m.
R802 3 the rafters are framed opposite each other at the ridges.
Roof the ridges hips and valleys have shall be designed as beams for roof slopes 3 ft.
The american plywood association says there s no reduction in strength for nails overdriven by 1 16in.
Determine how many rafters you ll need for the roof.
Daily safety inspection report sample is an audit report which is obviously crucial for any company to track the health and well being of the employees.
Roof must be complete before framing inspection.
Determine if continuous headers are toe nailed to studs with 4 8d nails.
Along the edges and every 12 in.
Get fix for any cut damaged joist or truss from joist or truss company.
Add studs under all double girder truss double joist.
Inspect rafter materials and allowable spans r 802 1 r 802 5 tables r 802 5 1 1 r 802 5 1 8 a.
Job address is posted in a visible location per irc section r319 1.
Locate the grade mark on the rafter to determine species and grade.
1 roof constructed in accordance with approved layout.
Layout plans truss members connection schedule permanent bracing details dormers roof structures on manufacturer s drawings equipment appliances on man ufacturer s drawings location as per layout alignment bearing spacing connections to bearing points.
Toe nail rim board to sill plate at 6 on center.
Building is safe and accessible.
The fields in the template include equipment standards of workers.
For most load bearing requirements a roof truss will need to be placed every two feet along the walls.
R802 3 notches on the ends of rafters don t exceed the nominal joist depth.
Roof sheathing is nailed every 6 in.
For all new construction.
2 bracing section 8 3 coupled roof connections ceiling joists to rafters collar ties to rafters 7 1 2 2 4 tie downs section 9 5 transfer of wall frame bracing 8 3 6 9 6 point loads including beams struts are adequately supported.
Roof framing inspection checklist 1.