Assemble so that trailing edge of the slide is closest to the long end of the pole and that the single hole is opposite the wheels of the head frame.
Roof rake instructions.
Filter instructions by type.
Allow extra material for rake and sloped side details and trim to exact length during application.
Find assembly instructions for your garant product.
Insert a magnetic 1 4 inch driver bit into a power drill.
Align the center bend of the ridge cap directly over the center line of the roof ridge.
Place wheels on bottom portion of roof and push upwards.
Telescoping snow roof rake.
Ridge caps should be installed so that all end laps are away from the prevailing wind.
So you accidentally threw out the product assembly instructions.
Repeat this on both sides of the roof.
Click on the link below to get detailed assembly instructions for your garant tool.
Use your chalk and tape measure to mark about 12 inches up on the roof for the first set of shingles.
This is our dynamo model removing wet heavy snow about 6 deep.
Unroll and cut the roof fast 95 base to the appropriate length.
As you can see below just use a simple lateral move to position the roof razor roof rake then an easy push and watch the snow come down.
Iko recommends that the remainder of the width used to create the starter strip be used for the first run of roof fast 95 base.
Assembly instructions titan and dynamo roof razor two 7 16 wrenches are required to secure slotted pole to the head frame.
One by 2 inch rake boards often cover the exposed top edge of the siding when there also is an eave overhang on the gable end.
Shingle saver snow roof rake pk90471 sled style gauge rake pk90453 smoother pk90283 snow roof rake 3 handles pk90026 snow roof rake 4 handles pk90228 spiked roller pk90115 stainless steel scraper pk90284 structron sta lok repair kit str 662 topping underlayment squeegee pk90434 tree pruner with interchangeable saw.
Choose the product below to download a printable copy of your instructions.
Continue to chalk additional guidelines based on the width of the shingle through at least four courses rows across the roof.
Roof rake boards are installed in different widths based on the surface being covered.
Tape and to fasten the rake every 6 to 12 up the slope of the roof with the appropriate screws.
Total control 6 cubic foot poly wheelbarrow with total control handles.
Every 5 inches make a new mark until you get to the rop of the roof.