I would recommend a 1 x2 dl drip edge.
Roofing drip edge necessary.
Reasons to use drip edge.
A furring edge is a strip of one by two wood you install on the vertical surface of the house just beneath the roof s edge.
It is if you don t want drooping and cracking edges or want to stop wind driven rain from getting to the roof deck.
A drip edge shall be provided at eaves and rake edges of shingle roofs.
This should have been installed prior to the starter row first row of shingles.
But you re going to have a tough time of making a good looking job without it.
A drip edge has to be resistant to possible corrosion and should be 36 gauge or larger.
Set your store to see local availability.
Drip edge is commonly made of steel that is galvanized or covered in a protective coating like galvalume or a painted finish.
When you install the drip edge over this strip it keeps the lower flange further from the home s siding which helps to keep water further from the home.
Install drip edges on the eaves first.
Drip edge isn t necessary anywhere as long as the roofing material is applied properly.
Drip edge is a metal flashing that is installed at the edges of the roof to help control the flow of water away from the fascia and to protect the underlying roofing components.
The main purpose of the drip edge is to direct the flow of water away from the fascia board and to help protect the rakes and eaves of your roof.
No calk galvanized steel drip edge pipe flashing model 11815 11 92 11 92.
The dl actually protrudes about 1 2 beyond the decking.
Adjacent segments of drip edge shall be overlapped not less than 2 inches 51 mm.
Shop 30 14 results for drip edge flashing.
The drip edge also gives us a nice straight edge with which to align roof shingles slates or other roofing material.
If a new roof is going to maintain soundness and value is going to be added to a home a drip edge is a necessity.
Drip edges shall extend not less than 1 4 inch 6 4 mm below the roof sheathing and extend up back onto the roof deck not less than 2 inches 51 mm.
Directs water away from the fascia and prevents water from rotting the fascia over time.
Tape measure hammer pencil ladder small roofing nails tin snips before you start the installation remove all dirt and debris from the roof and take the measurements of the exterior edges to determine how much drip edge is required for the project.
It is non corrosive and non staining so that your roof looks good but is structurally stable.
Drip edge varies in dimensions but typically the flange that nails to the roof surface is about 2 5 wide and the vertical edge that directs roof runoff down and away is about 1 5 in depth.